Call Email

Products

OPEN-BACK LOAD LINE BOX

Click for Assembly Guide

With removable panel removed for easy access to U-Bolts and the ability to slide load line box over flanges OR Remove load line box over valves for easy access to replace valves.
  • Metal load line  spill containment.
  • Aluminum load line  spill containment.
  • Slides over oil company’s piping, valves, flanges and aluminum cladding.
  • Cost effective.
  • Quick installation (20 minutes).
  • Saves time: i.e. Tank truck trying to unload with broken valve. The old system was a 2 hour job for crew truck and 2 men. Secure Enviro’s design takes 20 minutes for one man to change out valve while the tank truck waits.
  • Constructed out of steel or aluminum.
  • Can be custom built.
  • All MTR’s available upon request.
  • Can be sprayed inside with liner or insulation. Heat tracing compatible.
  • Built to engineering specs.
  • Lockable.
  • All boxes need to be electrically grounded on site to company specs.

PIG TRAP BOXES

  • Can be built to suit.
  • Lids can be used as splash or wind protection.
  • Aluminum pig traps light enough to haul back to battery to empty.